This Report has been prepared in accordance with the agreement made between Province Government, Ministry of Physical Infrastructure Development, Infrastructure Development Directorate, Infrastructure Development Office, Phidim, Panchthar and the Consulting Firm Harmonic Engineering Pvt. Ltd., Kathmandu for Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detailed Design and Preparation of Detail Project Report (DPR) of Nawa Khola Bridge Along Aarubote-Limba Road, Connecting Miklajung Rural Municipality-07 & 03, Panchthar.
The Bridge site is Aarubote Limba Road section in Miklajung Rural Municipality-07&03, Panchathar district connecting road section along the two banks Nawa Khola. The bridge site is located at Nawa Khola, Aarubote Limba Road, Miklajung Rural Municipility-03 & 07, Panchthar about 65 Km East from District headquarters (Phidim) and 150 Km Koshi Province headquarter (Biratnagar). The alignment starts from Aarubote Limba Road. It is an important road since it connects area of Miklajung Rural Municipality to Tamor corridor, Phidim and rake rabi road also.